Undertaking a restoration project can be daunting for anyone. Our new feature "Follow The Project" will show the work that is being carried out and will highlight the stresses and smiles. Our English speaking project manager is leading the work.

ProjectInital.jpg (58839 bytes)
The beginning... 
DSCN1422.jpg (44320 bytes) DSCN1415.jpg (41220 bytes) DSCN1411small.jpg (74820 bytes) DSCN0602.JPG (101768 bytes) DSCN0595.JPG (168241 bytes) DSCN1421.jpg (38944 bytes)
DSCN1419.jpg (42908 bytes) DSCN1420.jpg (51230 bytes)
The brick and stone built cottage comprises six rooms over two floors. There is also a large cantina under the front terrace and a large loft. The garden has two chicken sheds adjoined to the house. 
There is a large mulberry tree at the back which is blocking most of the light. There is also an additional brick shed. 
One of the first floor rooms has a crack in the wall and the floor has lifted in the middle. 
There is no internal staircase and no bathroom.
Week 1:
DSC01237.JPG (150773 bytes) DSC01239.JPG (142762 bytes) DSC01240.JPG (142558 bytes) DSC01248.JPG (147737 bytes) DSC01241.JPG (144232 bytes) DSC01243.JPG (133413 bytes)
DSC01246.JPG (147433 bytes) DSC01244.JPG (159100 bytes)
The tree has gone and instantly made the back more open and light. 
Two of the chicken sheds have been demolished. The rubble is put down to make the base for the planned patio.
After investigating the crack in the wall a doorway was found.
Render is being taking off to expose an internal stone wall that will become a feature. 
All fireplaces, unsupporting walls and 1st floor floors are being knocked out. 
Week 2:
DSC01295.JPG (158381 bytes) DSC01294.JPG (128826 bytes) DSC01296.JPG (162476 bytes) DSC01297.JPG (154362 bytes) DSC01400.JPG (163595 bytes)
After further removing of render the stone wall is half made from newer bricks.
New steel beams have been cemented in place and pot bricks inserted to make the new 1st floor. 
A wall in the original hall has been removed to enlarge the planned kitchen.
Week 3:
DSC01401.JPG (141501 bytes) DSC01402.JPG (135436 bytes) DSC01405.JPG (159449 bytes) DSC01407.JPG (153192 bytes) DSC01410.JPG (129600 bytes)
Mesh and concrete have been put over the new floor. 
Work on the new electrics has been started. 
Week 4:
DSC01470.JPG (151804 bytes) DSC01473.JPG (121840 bytes) DSCN2572.jpg (91656 bytes) DSC01472.JPG (142061 bytes) DSC01474.JPG (146963 bytes) DSC01475.JPG (135127 bytes)
DSCN2569.jpg (72578 bytes)  
New walls on the first floor have started to go in and divide the space up into three bedrooms and a bathroom

One of the doors onto the the terrace has been changed and will become the bathroom window. 

The space for the spiral staircase has been sectioned off.
The window in the master bedroom has been moved across to allow for a new dividing bedroom wall. 
Week 5:
DSC01542.JPG (151233 bytes) DSC01544.JPG (142319 bytes) DSC01547.JPG (133468 bytes) DSC01548.JPG (133478 bytes) DSC01549.JPG (139936 bytes)
A window in the master bedroom has just started to be knocked through.
The electrician has been to fit electrics in the new walls. 
Dividing walls have been erected are being plastered.
The fireplace in the kitchen has been knocked out. 
Ideas for flooring, kitchen and bathroom suites are being finalized. 
Week 6:
DSCN3181.jpg (47260 bytes) DSCN3188.jpg (52892 bytes) DSCN3183.jpg (47280 bytes) DSCN3185.jpg (51319 bytes) DSCN3186.jpg (51113 bytes)
DSCN3184.jpg (43451 bytes) DSCN3187.jpg (41917 bytes)
A channel was dug in the kitchen to accommodate central heating pipes.
Shower and water supply fitted for Bathroom
Sewerage and drainage for bathroom installed 
Central heating pipes in.
Cement removed from stone wall in living room.
A hole for an additional window kitchen was made
The owner came to select the bathroom suite and tiles.
Week 7:
DSC01576.JPG (150670 bytes)
DSC01574.JPG (153412 bytes) DSC01571.JPG (154285 bytes) DSC01567.JPG (153303 bytes) DSC01565.JPG (163648 bytes)
DSC01552.JPG (136420 bytes) DSC01568.JPG (106691 bytes)
Estimate for windows and doors received
Started rendering the living room
Finished the central heating pipes downstairs
Work started on the exposed stone wall
Living room floor cemented
A glimpse of what happened in between:
   
Come back for a look at the finished project soon.
Properties of the month

Habitable terraced.
3 bedrooms. Ready to move into.

MORE

Produce your own wine.
Over 7 hectares with small dwelling to renovate.

MORE

4 bedroom detached villa near sea.
New property. Habitable but requiring modernisation.  
MORE

REDUCTION OF THE MONTH
House in historic village to be modernised with small garden. Reduced by €15,000 

MORE